Table 1. Lava Flow Frequencies and others parameters for each project site.

                cumulative
                fractional
interval, yrs study area existing existing+ Site B Site B+ Site C Site C+ cover
0-1000 11 4 6 1 1 1 1 0.196
1000-2000 4 2 2 0 0 1 1 0.423
2000-3000 2 2 2 1 1 0 0 0.437
3000-4000 4 3 3 0 0 0 0 0.533
4000-5000 2 1 1 0 0 0 0 0.631
5000-6000 6 1 4 1 1 0 0 0.832
6000-7000 5 1 4 0 0 0 0 0.852
7000-8000 5 1 1 0 0 0 0 0.906
8000-9000 3 0 3 0 0 0 0 0.934
9000-10,000 2 1 2 1 2 1 1 0.988
10,000-11,000 3 1 1 0 0 0 0 0.995
11,000-12,000 1 0 1 0 1 0 0 1
>12,000 1 0 0 0 0 0 0 1
                 
Ave. /1000 yrs 3.8 1.3 2.3 0.31 0.46 0.23 0.23  
STDev /1000 yrs 1.9 0.89 1.3 0.43 0.57 0.36 0.36  
TOTAL 49 17 30 4 6 3 3  
Area, sq. km 552.85 29.36 345.22 2.492 34.95 0.5968 15.6  

Last Updated on 1/13/99
By Jim Kauahikaua